After: Waiting on new window-back to original size. plastic for now |
This week's painting is interior. I had my main floor bathroom remodeled during the month of July -I live in a house built in 1890 or thereabouts, so no ensuite bathrooms in this ole gal-and to save $1000 I took on the painting of said bathroom with assistance from my daughter and son-in-law. Then, since the basement is not finished according to modern standards, there was quite a bit of dirt, dust and other detritus that fell through the old floorboards during the tear down and rebuild onto the basement floor. Since the floor and surrounding area had to be cleaned anyway, it seemed a good time to paint the old wall and floor, at least in that section. I am not a glutton for punishment, after all! Between that, having a friend come for a long weekend along with the two of us driving back and forth to a Kaiserslautern High School reunion, it has been a busy time. Then the bathtub refinish was the last item and happened Monday. That was less than stellar so now the same kid is coming back today to try and buff out the many imperfections in the new finish. When he masked off the bathroom - all sparkling new - his tape ripped off the paint in several areas so I need to go back and touch that up once he is gone today. Not sure if he will tape it off again, so I am not willing to do it any more than necessary.
Before: ceiling above shower raised back to be level with the rest of the room; toilet, medicine cabinet, light and sink replaced. |
Here is the painted floor in the basement-nothing glamorous but looks fresh :
No comments:
Post a Comment